MPT South eyes CALAX completion by 2024 with resolution of ROW issues
The entire 45-kilometer Cavite-Laguna Expressway is expected to be completed by 2024, an executive of MPT South said over the ...
Read moreThe entire 45-kilometer Cavite-Laguna Expressway is expected to be completed by 2024, an executive of MPT South said over the ...
Read moreRoad trips are a popular summer activity, and so MPT South invites travelers to “Biyaheng South” (travel to the South) ...
Read moreBINAN CITY - Metro Pacific Tollways Corporation (MPTC), the toll road development arm of Metro Pacific Investments Corporation (MPIC), through ...
Read moreBy Roy Tomandao Metro Pacific Tollways South (MPT South), a subsidiary of Metro Pacific Tollways Corporation (MPTC), the infrastructure arm ...
Read moreIn tone and content, the online edition mirrors the editorial thrust of the newspaper. While hewing to the traditional precepts of fairness and objectivity, MS believes the news of the day need not be staid, overly long or dry. Stories are succinct, readable and written in a lively style that has become a hallmark of the newspaper.
6th Floor Universal Re Bldg., 106 Paseo De Roxas cor. Perea Street, Legaspi Village, 1226 Makati City Philippines
Trunklines: 832-5554, 832-5556, 832-5558
© 2021 Manila Standard - Designed and Developed by Neitiviti Studios.
© 2021 Manila Standard - Designed and Developed by Neitiviti Studios.